Telehouse West
Telehouse · London · London Metro · United Kingdom
- Design resilience tier
- III
- Redundancy (as published)
- Incoming power feeds Dual redundant, Diverse route. Generators 8, N+1 Redundancy. UPS configuration 2(N+1). Cooling system Chilled water system air conditioning. Room air conditioning units N+25% (fact sheet Telehouse West, 08-2023). Location page (updated 13-07-2026): Four redundant HV power systems, from separate grids to each building on the Docklands site; 8 x 2.5MVA 11kV Generators with N+1 redundant standby generators with a minimum of 24 hours autonomy at full capacity; 2 (N+1) redundant UPS floor by floor; Redundant A & B power feeds to customer equipment; 6 x 2.7MW chillers N 2 configuration; Room Air Conditioning Units (RACUs) to provide down-flow chilled water system at N 25%.
- Floor area
- 5,000 m² whitespace
- Security
- 24/7 on-site security
- Year built
- 2010
- Rack density
- 2–10 kW
Platform reviewed · 24 Sept 2026 · Recent
- Density (as published)
- Telehouse West data centre can provide Shared Facilities Management (SFM), Dedicated Facilities Management (DFM) and high density rack hosting up to 10kW. Average power per rack - 4kW (location page, updated 13-07-2026). Power availability per rack 2kW to 4kW (London-overview page 01-07-2026, campus brochure 08-2023; fact sheet West 08-2023: 2kW to 4k).
- Cooling
- Air cooling, Free cooling
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- Renewable power
- 100% renewable power
- Services
- Colocation and connectivity
- Certifications 10
- ISO 27001ISO 9001ISO 14001ISO 50001ISO 45001ISO 22301SOC 2PCI DSSClimate Neutral Data Centre PactCarbon Trust Standard
Location
View on the full map · 4 locations at this address · Elevation 6 m above sea level

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.