- Redundancy (as published)
- Building incoming power equipment: 2-feeder wiring / generator configuration N + 1 / UPS configuration N + 1 / air-conditioner configuration N + 2 (telehouse.com/ja); incoming power method 66kV main and standby line method / in-house generators N+1 redundant configuration (48 hours or more of operation without refuelling) / UPS equipment N+1 redundant configuration (15 minutes of supply) / air-conditioner configuration N+2 redundant, with UPS (KDDI 2016-02-12)
- Floor area
- 4,000 m² whitespace
- Security
- 24/7 on-site security
- Year built
- 2016
- Rack density
- 27 kW
Platform reviewed · 26 Sept 2026 · Recent
- Density (as published)
- Power/rack: max. effective 30kVA, average effective 15kVA (telehouse.com/ja); max.: rated 42kVA (effective 30kVA) per rack; average: rated 21kVA (effective 15kVA) per rack (KDDI 2016-02-12)
- Power band
- 5–20 MW
Platform reviewed · 26 Sept 2026 · Recent
- Cooling
- Air cooling
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- Design PUE
- Design PUE 1.2 to 1.4
- PUE note
- Design PUE of 1.31.
- Services
- Colocation, connectivity, high-density and wholesale
- Certifications 1
- ISO 27001
Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.