Discover datacenters / United States

Switch Tahoe Reno

Switch · McCarran · Reno Metro · United States

Redundancy (as published)
Three N+2 color coded systems to deliver tri-redundant power and 100% uptime (The Citadel Campus, TAHOE RENO 01 & 02 OneSheet, 2023-11-01)
Security
24/7 on-site security
Density (as published)
Up to 55kW per cabinet for high-density deployments (Tahoe Reno 02 OneSheet, 2023-11-01) | Reduce footprint with high-density up to 55kW per cabinet (switch.com/l/tahoe-reno-data-centers/) | Up to 2MW per cabinet (location page, accessed 2026-10-30)
Availability
Availability on request

Imported · Recorded 08 Jun 2026 · Not recent

Cross-connect
On request
Renewable power
100% renewable power
PUE note
Extremely efficient power usage effectiveness (PUE) of 1.18 (one sector best annual average) (Tahoe Reno 02 OneSheet, 2023-11-01)
Services
Colocation, high-density and connectivity

Location

View on the full map · Elevation 1,469 m above sea level

Aerial view of Switch Tahoe Reno
Aerial view of the site. Imagery MapTiler, OpenStreetMap contributors.

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.