Discover datacenters / Japan

STACK Infrastructure TKY01 Tokyo

STACK Infrastructure · Inzai · Tokyo Metro · Japan

Design resilience tier
III
Redundancy (as published)
Electrical redundancy (generators / UPS): N+2 block redundant configuration · high-efficiency air-cooled chillers in N+2 redundant configuration · wall-blowing air conditioners in N+2 redundant configuration · fuel storage: minimum 24 hours of capacity (location page JA, updated 27-01-2026); Electrical Redundancy (Generators / UPS) - N+1 Block Redundant, with optional STS · Cooling - N+1 air-cooled chillers · Fuel Storage - Minimum 24 hours of operation (factsheet 18-01-2022)
Security
24/7 on-site security
Density (as published)
Density - Deployments supported in excess of 24kW per cabinet (factsheet 18-01-2022)
Power band
5–20 MW

Platform reviewed · 26 Sept 2026 · Recent

Cooling
Air cooling
Availability
Availability on request

Imported · Recorded 08 Jun 2026 · Not recent

Expansion
Expansion planned on site
Cross-connect
On request
Design PUE
Design PUE 1.2 to 1.4
PUE note
Annualised target PUE of 1.30.
Hyperscale facility
Yes
Services
Colocation and wholesale

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.