Discover datacenters / United Kingdom
ServerHouse P2
ServerHouse · Fareham · Regional UK · United Kingdom
- Design resilience tier
- II
- Redundancy (as published)
- It benefits from N+N UPS, backup generator, N+1 cooling, redundant connectivity and a series of security measures; Active UPS for a perfect sinewaye; 20 minutes UPS; 120 hours generator fuel supply; LEGACY-PAGINA West Barn (dev.serverhouse.co.uk): N+N UPS, Backup generator, N+2 cooling
- Max. rack density
- 3–8 kW/rack
- Density (as published)
- 3 – 8kW per rack (rubriek Power and Efficiency); suitable for racks from 3–6 kW (introductie), beide op de locatiepagina van 07-01-2025; legacy-pagina West Barn (dev.serverhouse.co.uk): Upto 8kW of power per rack en 3kW to 6kW of power per rack
- Power band
- 1-5MW
- Availability
- Availability on request
- Cross-connect
- On request
- Renewable power
- Renewable, share not published
- Design PUE
- Design PUE 1.2–1.4
Data trust
- Power
- Imported · Recorded 08 Jun 2026 · Recent
- Rack density
- Platform reviewed · 05 Sept 2026 · Recent
- Availability
- Imported · Recorded 08 Jun 2026 · Not recent
ColocationConnectivityHigh-density / AIISO 27001Cyber EssentialsISO 9001PCI DSSEU Code of ConductCarbon Neutral
Need a quote or an introduction? One request, with a response within two business days.
Request a quoteDo you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.