Discover datacenters / United Kingdom
ServerHouse P2
ServerHouse · Fareham · Regional UK · United Kingdom
- Design resilience tier
- II
- Redundancy (as published)
- It benefits from N+N UPS, backup generator, N+1 cooling, redundant connectivity and a series of security measures; Active UPS for a perfect sinewaye; 20 minutes UPS; 120 hours generator fuel supply; LEGACY PAGE West Barn (dev.serverhouse.co.uk): N+N UPS, Backup generator, N+2 cooling
- Floor area
- 186 m² total building
- Rack density
- 3–8 kW
Platform reviewed · 05 Sept 2026 · Recent
- Density (as published)
- 3 – 8kW per rack (rubriek Power and Efficiency); suitable for racks from 3–6 kW (introductie), beide op de location page van 07-01-2025; legacy page West Barn (dev.serverhouse.co.uk): Upto 8kW of power per rack en 3kW to 6kW of power per rack
- Power band
- 1–5 MW
Imported · Recorded 08 Jun 2026 · Recent
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- Renewable power
- Renewable, share not published
- Design PUE
- Design PUE 1.2 to 1.4
- PUE note
- PUE of 1.34.
- Services
- Colocation, connectivity and high-density
- Certifications 5
- ISO 27001Cyber EssentialsISO 9001PCI DSSEU Code of Conduct
Location
View on the full map · Elevation 14 m above sea level

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.