ServerHouse P2

ServerHouse · Fareham · Regional UK · United Kingdom

Design resilience tier
II
Redundancy (as published)
It benefits from N+N UPS, backup generator, N+1 cooling, redundant connectivity and a series of security measures; Active UPS for a perfect sinewaye; 20 minutes UPS; 120 hours generator fuel supply; LEGACY-PAGINA West Barn (dev.serverhouse.co.uk): N+N UPS, Backup generator, N+2 cooling
Max. rack density
3–8 kW/rack
Density (as published)
3 – 8kW per rack (rubriek Power and Efficiency); suitable for racks from 3–6 kW (introductie), beide op de locatiepagina van 07-01-2025; legacy-pagina West Barn (dev.serverhouse.co.uk): Upto 8kW of power per rack en 3kW to 6kW of power per rack
Power band
1-5MW
Availability
Availability on request
Cross-connect
On request
Renewable power
Renewable, share not published
Design PUE
Design PUE 1.2–1.4

Data trust

Power
Imported · Recorded 08 Jun 2026 · Recent
Rack density
Platform reviewed · 05 Sept 2026 · Recent
Availability
Imported · Recorded 08 Jun 2026 · Not recent
Claim this listing
ColocationConnectivityHigh-density / AIISO 27001Cyber EssentialsISO 9001PCI DSSEU Code of ConductCarbon Neutral

Need a quote or an introduction? One request, with a response within two business days.

Request a quote

Do you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.