Discover datacenters / Germany
Portus/IPHH HH3 (Wendenstrasse 251)
Portus Data Centers · Hamburg · Hamburg Metro · Germany
- Design resilience tier
- III
- Redundancy (as published)
- Supply via redundant underground 10kV grid. Redundant N+1 10 kV/400V transformer station. 2x 1000 kVA (maximum 3x) power generators N+1, automatically feed 100% of the facility within 30 seconds, fuel storage sufficient for 24 hours continuous operation at 100% load. Up to 6x 500 kVA UPS modules providing with N+1 redundancy. At least 10 minutes of battery autonomy. Redundant power distribution. N+1 with 100 % highly efficient direct and filtered free cooling. Cold aisle containment for optimized air-flow. Multiple building entry points for fiber cables. Two separate MeetMeRooms (MMR). This location is designed as a highly redundant site.
- Cooling
- Air cooling, Free cooling
- Availability
- Availability on request
- Cross-connect
- On request
- Renewable power
- 100% renewable power
Data trust
- Availability
- Imported · Recorded 08 Jun 2026 · Not recent
ColocationConnectivityISO 27001HDS
Need a quote or an introduction? One request, with a response within two business days.
Request a quoteDo you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.