AI Hub AUG (Amberg, Unterallgäu)

Polarise · Amberg · Regional Germany · Germany

Site status
Planned
Expected operational
September 2027
Design resilience tier
III
Redundancy (as published)
PLANNED — locatiekaart AI Hub AUG: 'N+1 backup, liquid cooling ready'. AI Pod-architectuur die according to the press release ook in Amberg wordt uitgerold: 'N+1 power & cooling redundancy', '4+ power feeds per rack', 'Cold aisle containment', 'Liquid cooling by default'
Rack density
from 150 kW
Density (as published)
AI Pod-architectuur (operator-wide, according to the press release ook in Amberg): 'GPU-Ready by Design High-density from 150 kW per rack, liquid cooling, N+1 redundancy, scalable AI Pods from 1 MW per module'; 'Starting from 1 MW per Pod'; '16 racks per Pod (up to 45U usable)'; '150 kW+ per rack'
Power band
20–50 MW

Imported · Recorded 08 Jun 2026 · Recent

Cooling
Air cooling, Liquid-ready
Availability
Planned

Platform reviewed · 04 Sept 2026 · Recent

Cross-connect
On request
Services
Colocation and high-density

Location

View on the full map · Elevation 598 m above sea level

Aerial view of AI Hub AUG (Amberg, Unterallgäu)
Aerial view of the site. Imagery MapTiler, OpenStreetMap contributors.

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.