Discover datacenters / Germany
AI Hub AUG (Amberg, Unterallgäu)
Polarise · Amberg · Regional Germany · Germany
- Site status
- Planned
- Expected operational
- September 2027
- Design resilience tier
- III
- Redundancy (as published)
- PLANNED — locatiekaart AI Hub AUG: 'N+1 backup, liquid cooling ready'. AI Pod-architectuur die according to the press release ook in Amberg wordt uitgerold: 'N+1 power & cooling redundancy', '4+ power feeds per rack', 'Cold aisle containment', 'Liquid cooling by default'
- Rack density
- from 150 kW
- Density (as published)
- AI Pod-architectuur (operator-wide, according to the press release ook in Amberg): 'GPU-Ready by Design High-density from 150 kW per rack, liquid cooling, N+1 redundancy, scalable AI Pods from 1 MW per module'; 'Starting from 1 MW per Pod'; '16 racks per Pod (up to 45U usable)'; '150 kW+ per rack'
- Power band
- 20–50 MW
Imported · Recorded 08 Jun 2026 · Recent
- Cooling
- Air cooling, Liquid-ready
- Availability
- Planned
Platform reviewed · 04 Sept 2026 · Recent
- Cross-connect
- On request
- Services
- Colocation and high-density
Location
View on the full map · Elevation 598 m above sea level

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.