- Design resilience tier
- III
- Redundancy (as published)
- UPS Redundancy: N+1 / Backup Power Redundancy: N+1 via catcher / Fuel autonomy: 72 hours at full load fully-rated / Cooling redundancy: 2N on central plant, N+2 on CRAH's
- Power band
- 5-20MW
- Cooling
- Air cooling
- Availability
- Availability on request
- Cross-connect
- On request
- Renewable power
- 100% renewable power
- Design PUE
- Design PUE 1.2–1.4
Data trust
- Power
- Imported · Recorded 08 Jun 2026 · Recent
- Availability
- Imported · Recorded 08 Jun 2026 · Not recent
ColocationConnectivityHigh-density / AIISO 27001ISO 14001ISO 50001HDSEU Code of ConductHDS 1Code of ConductAPSADTier III design (Uptime Institute, 2014)