- Design resilience tier
- II
- Redundancy (as published)
- A-B Power Option from different UPSs; N+1 Cooling Capacity; The Amber datacenter is built with Tier 2 specifications.
- Floor area
- 372 m² total building
- Year built
- 2015
- Density (as published)
- P9: 30AMP/208v/3P UPS-Generator Power, 8738va Power Consumption (42A/208v); P3: 30AMP/120v UPS-Generator Power, 2880va Power Consumption (24A/120v)
- Power band
- 1–5 MW
Platform research · Recorded 15 Oct 2026 · Recent
- Cooling
- Air cooling, Free cooling
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- PUE note
- The operator describes a significantly improved PUE; no figure is published.
- Services
- Colocation and connectivity
- Certifications 1
- ISO 27001
Location
View on the full map · Elevation 193 m above sea level

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.