NTT DOCOMO BUSINESS TK6 - Tokyo
NTT DOCOMO BUSINESS (Data Centers) · Tokyo · Tokyo Metro · Japan
- Redundancy (as published)
- Incoming power: extra-high-voltage main and standby line supply; emergency generation: diesel engine (for rack power), 48 hours or more of operation without refuelling; uninterruptible power (UPS): N+1 parallel redundant configuration, rotary UPS; air conditioning: water-cooled, 24-hour continuous operation, N+1 configuration, outside-air cooling, UPS for air conditioning; dual power configuration: duplicated distribution boards (brochure_tokyo_6_data_center_jp.pdf, as of March 2026); furthermore, all critical equipment is in redundant configuration. (tokyo6.html)
- Floor area
- 7,200 m² whitespace
- Security
- 24/7 on-site security
- Year built
- 2012
- Density (as published)
- Achieves high-density equipment installation with 1.5 times the power supply and load capacity per rack of previous data centres. (tokyo6.html); power additions: AC single-phase 100V 10A, 20A, 30A, AC single-phase 200V 15A, 20A, 30A selectable (brochure_tokyo_6_data_center_jp.pdf, as of March 2026)
- Power band
- 5–20 MW
Platform reviewed · 26 Sept 2026 · Recent
- Cooling
- Air cooling, Free cooling, Liquid-ready
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- Services
- Colocation and connectivity
- Certifications 7
- ISO 27001ISO 9001ISO 14001ISO 22301ISAE 3402PCI DSSJIS Q 15001 (Privacy Mark)
Location
View on the full map · Elevation 2 m above sea level

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.