Discover datacenters / Japan

NTT DOCOMO BUSINESS TK4 - Tokyo

NTT DOCOMO BUSINESS (Data Centers) · Tokyo · Tokyo Metro · Japan

Redundancy (as published)
Incoming power: main and standby line method; emergency generation: gas-turbine engine, 48 hours of operation without refuelling (fuel supply priority contract in place); uninterruptible power (UPS): N+1 parallel redundant configuration, battery hold-up time 10 minutes; air-conditioning equipment: water-cooled, N+1 configuration (brochure_tokyo_4_data_center_jp.pdf, as of August 2025); redundantly configured air-conditioning equipment together with UPS (uninterruptible power supply) and emergency generation equipment supply stable power even in an emergency. (same source); uninterruptible power (UPS) N+1 configuration (tokyo4.html)
Floor area
5,800 m² whitespace
Security
24/7 on-site security
Year built
2008
Density (as published)
High-density equipment installation: standard power supply 6kVA/rack; the high floor-load design allows high-density equipment installation. (brochure_tokyo_4_data_center_jp.pdf, as of August 2025)
Cooling
Air cooling
Availability
Availability on request

Imported · Recorded 08 Jun 2026 · Not recent

Cross-connect
On request
Services
Colocation and connectivity

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.