Discover datacenters / Germany
GDC - Munich 1 Data Center
NTT DATA, Inc. · Kirchheim Bei München · Munich Metro · Germany
- Design resilience tier
- III
- Redundancy (as published)
- UPS N+1 redundant bridging time minimum 15 minutes battery at full load. Emergency generators (2 x 1,400kVA) fuel storage for 48 hours. Redundant water-cooled system supported by free-cooling (N+1). Star-shaped chilled water pipes to CRAH units with redundant pumps. Redundant cabling infrastructure. Service level agreement: 99.95% power uptime availability. (fact sheet 2024)
- Power band
- 1-5MW
- Cooling
- Air cooling, Free cooling, Liquid-ready
- Availability
- Availability on request
- Cross-connect
- On request
Data trust
- Power
- Imported · Recorded 08 Jun 2026 · Recent
- Availability
- Imported · Recorded 08 Jun 2026 · Not recent
ColocationConnectivityISO 22301ISO 27001ISO 45001ISO 50001ISO 9001PCI DSS
Need a quote or an introduction? One request, with a response within two business days.
Request a quoteDo you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.