Discover datacenters / Germany

NorthC Nuremberg

NorthC Group B.V. · Nuremberg · Nuremberg Metro · Germany

Design resilience tier
III
Redundancy (as published)
2x 10 kV (2N) connection to the utility grid. UPS redundancy: N+1. Generator redundancy: N+1. Cooling redundancy: 2N+1. Chilled water, redundant (free) cooling with cooling towers. According to DIN 50600 CAT III standard. 99,999% availability.
Power band
5-20MW
Cooling
Free cooling
Availability
Availability on request
Cross-connect
On request
Renewable power
100% renewable power

Data trust

Power
Platform reviewed · 04 Sept 2026 · Recent
Availability
Imported · Recorded 08 Jun 2026 · Not recent
Ask for current details
ColocationConnectivityHigh-density / AIISO 27001ISO 9001ISO 14001ISO 22301ISO 20000-1ISAE 3402PCI DSSEN 50600NEN 7510DDA

Need a quote or an introduction? One request, with a response within two business days.

Request a quote

This profile is managed by NorthC Group B.V. on ColoCompass.