NorthC Group B.V. · Nuremberg · Nuremberg Metro · Germany
- Design resilience tier
- III
- Redundancy (as published)
- 2x 10 kV (2N) connection to the utility grid. UPS redundancy: N+1. Generator redundancy: N+1. Cooling redundancy: 2N+1. Chilled water, redundant (free) cooling with cooling towers. According to DIN 50600 CAT III standard. 99,999% availability.
- Power band
- 5-20MW
- Cooling
- Free cooling
- Availability
- Availability on request
- Cross-connect
- On request
- Renewable power
- 100% renewable power
Data trust
- Power
- Platform reviewed · 04 Sept 2026 · Recent
- Availability
- Imported · Recorded 08 Jun 2026 · Not recent
ColocationConnectivityHigh-density / AIISO 27001ISO 9001ISO 14001ISO 22301ISO 20000-1ISAE 3402PCI DSSEN 50600NEN 7510DDA