Discover datacenters / Germany

NorthC Munich 1

NorthC Group B.V. · Munich · Munich Metro · Germany

Design resilience tier
III
Redundancy (as published)
10 kV (N+1) connection to the utility grid. UPS redundancy: N+1. Generator redundancy: N+1. Cooling redundancy: 2N+1. Chilled water, redundant (free) cooling with cooling towers. According to DIN 50600 CAT III standard. 99,999% availability.
Power band
1-5MW
Cooling
Free cooling
Availability
Availability on request
Cross-connect
On request
Renewable power
100% renewable power

Data trust

Power
Imported · Recorded 08 Jun 2026 · Recent
Availability
Imported · Recorded 08 Jun 2026 · Not recent
Ask for current details
ColocationConnectivityHigh-density / AIISO 27001ISO 9001ISO 14001ISO 20000-1ISAE 3402EN 50600

Need a quote or an introduction? One request, with a response within two business days.

Request a quote

This profile is managed by NorthC Group B.V. on ColoCompass.