Design resilience tier
III
Redundancy (as published)
Redundant power with independent A and B feeds to each cabinet
Max. rack density
2–15 kW/rack
Density (as published)
Standard Power Density (air cooling): 2-7 kW, up to 15 kW per cabinet. High-density (AI-ready): 15 kW to 150+ kW - On request
Power band
1-5MW
Cooling
Air cooling
Availability
Availability on request
Cross-connect
On request
Renewable power
100% renewable power
Design PUE
Design PUE 1.2–1.4

Data trust

Power
Platform reviewed · 04 Sept 2026 · Recent
Rack density
Platform reviewed · 04 Sept 2026 · Recent
Availability
Imported · Recorded 08 Jun 2026 · Not recent
Claim this listing
ColocationConnectivityHigh-density / AIISO 27001

Need a quote or an introduction? One request, with a response within two business days.

Request a quote

Do you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.