- Design resilience tier
- III
- Redundancy (as published)
- UTI Tier IV Design; UTI Tier III Design; UTI Tier III Facility; Electrical Redundancy: 2N/N+1; Cooling Redundancy: N+1 (neutradc.com, 04-10-2026) | Uptime Institute TCCD (Tier IV Design), Uptime Institute TCCD (Tier III Design), Uptime Institute TCCF (Tier III Facility) (sg.neutradc.com, Our Certifications)
- Rack density
- 6 kW
Platform research · Recorded 12 Oct 2026 · Recent
- Power band
- 5–20 MW
Platform research · Recorded 12 Oct 2026 · Recent
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- Services
- Colocation, connectivity and hybrid cloud
Location
View on the full map · Elevation 8 m above sea level

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.