Discover datacenters / Poland

Netia Data Center MIND

Netia S.A. · Jawczyce · Warsaw Metro · Poland

Design resilience tier
III
Redundancy (as published)
The Netia DC MIND facility meets the class three certification requirements according to EN/PN 50600. Three independent power paths and energy-saving solutions such as DRUPS. Two DRUPS HITEC PowerPRo2700 units of 2000 kW each. The entire complex is powered 100% by green energy.
Floor area
1,060 m² whitespace
Availability
Availability on request

Imported · Recorded 08 Jun 2026 · Not recent

Cross-connect
On request
Renewable power
100% renewable power
Services
Colocation and connectivity
Certifications 3
ISO 27001ISO 9001EN 50600

Location

View on the full map · Elevation 107 m above sea level

Aerial view of Netia Data Center MIND
Aerial view of the site. Imagery MapTiler, OpenStreetMap contributors.

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.