Discover datacenters / Poland

Netia Data Center BRAIN

Netia S.A. · Grodzisk Mazowiecki · Warsaw Metro · Poland

Design resilience tier
III
Redundancy (as published)
Data Center in Grodzisk Mazowiecki with all facilities and security systems to the TIER III standard. Specialised technical infrastructure from leading suppliers. Three 2 MW generator sets; ecological air conditioning with a free-cooling system in at least N+1 redundancy; power system with 3 independent supply lines, UPS modules and battery backup (including DRUPS).
Floor area
550 m² whitespace
Availability
Availability on request

Imported · Recorded 08 Jun 2026 · Not recent

Cross-connect
On request
Services
Colocation and connectivity

Location

View on the full map · Elevation 103 m above sea level

Aerial view of Netia Data Center BRAIN
Aerial view of the site. Imagery MapTiler, OpenStreetMap contributors.

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.