MIRAIT ONE Osaka No.1 Data Center

MIRAIT ONE Corporation · Osaka · Osaka Metro · Japan

Design resilience tier
III
Redundancy (as published)
Incoming power method: dual supply, main/standby line method (different substations) | emergency generation equipment: N+1 redundant configuration (gas-turbine type), 48 hours of continuous operation without refuelling | UPS: N+1 redundant configuration (N+2 and 2N also available) | communications equipment: building intake multi-carrier capable, redundant 2 routes (news release 2018-06-01)
Security
24/7 on-site security
Year built
2018
Rack density
6 kW

Platform research · Recorded 30 Sept 2026 · Recent

Power band
5–20 MW

Platform research · Recorded 30 Sept 2026 · Recent

Cooling
Air and indirect cooling, Free cooling
PUE note
Design PUE of 1.4.
Services
Colocation and connectivity

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.