- Redundancy (as published)
- Gasan Center: seismic design for magnitude 7.0 (2021-2022 LG CNS Sustainability Report); LG CNS data centres are operated as green data centres with redundant equipment, seismic design and maximised power efficiency, as well as standardised and automated operating environments and processes. (lgcns.com/kr, 2026-10-18)
- Floor area
- 12,734 m² whitespace
- Cooling
- Free cooling
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- PUE note
- Average PUE 2024: 1.49 (2024-2025 LG CNS Sustainability Report)
- Services
- Cloud and connectivity
- Certifications 2
- ISO 27001ISO 50001
Location
View on the full map · Elevation 11 m above sea level

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.