Lefdal Mine Data Center

Lefdal Mine Datacenter AS · Måløy · Regional Norway · Norway

Design resilience tier
III
Redundancy (as published)
132kV main grid with a dual supply, each expandable up to 200MW; two main 22kV distribution busses, one for each of the systems A and B; n+1 generators with a capacity of 2MW with unlimited run hours; in maintenance mode one of the substations may be disconnected, during which time the full IT load will be supported by the remaining active substation
Power band
50MW+
Cooling
Air cooling, Free cooling, Liquid-ready, Direct-to-chip, Immersion
Availability
Availability on request
Cross-connect
On request
Renewable power
100% renewable power
Design PUE
Design PUE < 1.2

Data trust

Power
Imported · Recorded 08 Jun 2026 · Recent
Availability
Imported · Recorded 08 Jun 2026 · Not recent
Claim this listing
ColocationConnectivityISO 27001ISO 9001ISO 14001ISO 45001Tier III Design Certified by Uptime Institute

Need a quote or an introduction? One request, with a response within two business days.

Request a quote

Do you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.