Lefdal Mine Data Center
Lefdal Mine Datacenter AS · Måløy · Regional Norway · Norway
- Design resilience tier
- III
- Redundancy (as published)
- 132kV main grid with a dual supply, each expandable up to 200MW; two main 22kV distribution busses, one for each of the systems A and B; n+1 generators with a capacity of 2MW with unlimited run hours; in maintenance mode one of the substations may be disconnected, during which time the full IT load will be supported by the remaining active substation
- Power band
- 50MW+
- Cooling
- Air cooling, Free cooling, Liquid-ready, Direct-to-chip, Immersion
- Availability
- Availability on request
- Cross-connect
- On request
- Renewable power
- 100% renewable power
- Design PUE
- Design PUE < 1.2
Data trust
- Power
- Imported · Recorded 08 Jun 2026 · Recent
- Availability
- Imported · Recorded 08 Jun 2026 · Not recent
ColocationConnectivityISO 27001ISO 9001ISO 14001ISO 45001Tier III Design Certified by Uptime Institute