- Redundancy (as published)
- Extra-high-voltage dual supply (main and standby line method). Separate systems from incoming power to server supply can be provided. Uninterruptible power supplies (UPS) in N+1 configuration, emergency generators (48 hours of operation without refuelling) fully equipped. | As a countermeasure against outages and failures, UPS for air conditioning and chilled-water storage tanks are also installed in an N+1 redundant configuration. | UPS redundant configuration, power supply time 5 minutes
- Security
- 24/7 on-site security
- Rack density
- 7 kW
Platform research · Recorded 30 Sept 2026 · Recent
- Density (as published)
- Rack supply power (rated power): average 4KVA, max. 8KVA (/datacenter/, 2023-05-16) | 100V 20A and 200V 30A power available (up to 8KVA max.). Redundant power circuits also available. (DC+, 2025-04-14) | Power per rack 2-8KVA/rack (building B, 2013-06-17)
- Cooling
- Air cooling
- PUE note
- Design PUE of 1.63 for building A and 1.323 for building B.
- Services
- Colocation, connectivity and cloud and managed services
- Certifications 1
- ISO 27001
Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.