Discover datacenters / Japan

IIJ Shiroi DCC

Internet Initiative Japan Inc. · Shiroi · Tokyo Metro · Japan

Design resilience tier
III
Redundancy (as published)
UPS: N+1 redundant configuration, three-phase four-wire; incoming power method: extra-high-voltage loop supply; emergency generators: generation fuel reserve of 72 hours or more (at maximum load); air conditioning: redundancy and outage protection based on an N+1 configuration (document 2019-12-19); power transmission routes to the server racks are redundant via different paths (document 2019-12-19)
Security
24/7 on-site security
Year built
2019
Rack density
20 kW

Platform reviewed · 26 Sept 2026 · Recent

Density (as published)
Power supplied (housing service, per rack): 230V30A as standard, 100V30A also available on request. *Expandable up to approx. 20kW per rack (press release 2023-07-03, phase 2 building); standard power density per rack 6kVA (menu.html); fully equipped with power distribution able to withstand high-load racks of the 20kVA/rack class (floor standard 6kVA/rack) (document 2019-12-19)
Cooling
Air cooling, Free cooling
Availability
Availability on request

Imported · Recorded 08 Jun 2026 · Not recent

Cross-connect
On request
Renewable power
Renewable, share not published
Design PUE
Design PUE 1.2 to 1.4
PUE note
Annual average PUE of 1.36 for the campus in 2023.
Services
Colocation and connectivity
Certifications 3
ISO 27001ISO 14001FISC Security Standards

Location

View on the full map · Elevation 22 m above sea level

Aerial view of IIJ Shiroi DCC
Aerial view of the site. Imagery MapTiler, OpenStreetMap contributors.

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.