Discover datacenters / United Kingdom

Imperium 315

Intercontinental Exchange, Inc. (ICE) · Basildon · Regional UK · United Kingdom

Design resilience tier
IV
Redundancy (as published)
ICE data center in Basildon, Essex (UK), designed and built on the principles of a Tier 4 guided facility | Powered by two diversely routed National Grid power feeds, each terminated via its own transformer station on site. | Forty-eight hours of emergency generator fuel storage as standard. (ice.com ICE Colocation, 2026-09-24) | Each Colocation Participant cabinet is provided with 2 dedicated feeds; one providing 'A'/Grey feed power and the other providing 'B'/Violet feed power, both supplied by a dual fed Hall PDU with a static transfer switch to fail over to the other feed when necessary without any disruption to service. (Operating Policies v5.16, effective 01-10-2026); (Basildon, Chicago, Mahwah) All three sites are built for uninterrupted access to the markets, with fully redundant and resilient systems, including power, market connectivity, and external connectivity, all managed by on-site ICE staff.
Floor area
7,000 m² whitespace
Rack density
4–18 kW

Platform reviewed · 24 Sept 2026 · Recent

Density (as published)
Cabinet options include standard 4kW up to 18kW high-density cabinets. Partial cabinets also available from 0.5kW. (ice.com ICE Colocation, 2026-09-24) | Radial circuits from power distribution units (PDUs) provide a Colocation Participant cabinet with either 4kW or 9kW of power. ... Alternative and higher cabinet density power options such as 6kW or 18kW are available on request and subject to feasibility. (Operating Policies v5.16, effective 01-10-2026)
Availability
Availability on request

Imported · Recorded 08 Jun 2026 · Not recent

Cross-connect
On request
Services
Colocation and connectivity

Location

View on the full map · Elevation 42 m above sea level

Aerial view of Imperium 315
Aerial view of the site. Imagery MapTiler, OpenStreetMap contributors.

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.