Redundancy (as published)
Incoming power equipment: extra-high-voltage dual supply (main and standby line) from different substations | UPS equipment: N+1 parallel redundant system | in-house generation equipment: emergency generators (N+1), 72 hours of continuous operation without refuelling (brochure SDC20250820)
Floor area
1,500 m² whitespace
Security
24/7 on-site security
Year built
2017
Rack density
18 kW

Platform reviewed · 26 Sept 2026 · Recent

Density (as published)
Power supply of up to 20kVA per rack. | Standard power: full rack 2kVA (maximum power capacity: 20kVA*1), half rack 2kVA (maximum power capacity: 6kVA), quarter rack 1kVA (maximum power capacity: 2kVA). *1: power capacity exceeding 10kVA is handled after prior consultation. | Usable power capacity is 80% of the rating or less. (hotnet.co.jp/datacenter/ + brochure SDC20250820)
Cooling
Air cooling, Free cooling
Availability
Availability on request

Imported · Recorded 08 Jun 2026 · Not recent

Cross-connect
On request
Renewable power
100% renewable power
Services
Colocation and connectivity
Certifications 1
ISO 27001

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.