S.T.E.P Sapporo Data Center
Hokkaido Telecommunication Network Co., Inc. (HOTnet) · Sapporo · Regional Japan · Japan
- Redundancy (as published)
- Incoming power equipment: extra-high-voltage dual supply (main and standby line) from different substations | UPS equipment: N+1 parallel redundant system | in-house generation equipment: emergency generators (N+1), 72 hours of continuous operation without refuelling (brochure SDC20250820)
- Floor area
- 1,500 m² whitespace
- Security
- 24/7 on-site security
- Year built
- 2017
- Rack density
- 18 kW
Platform reviewed · 26 Sept 2026 · Recent
- Density (as published)
- Power supply of up to 20kVA per rack. | Standard power: full rack 2kVA (maximum power capacity: 20kVA*1), half rack 2kVA (maximum power capacity: 6kVA), quarter rack 1kVA (maximum power capacity: 2kVA). *1: power capacity exceeding 10kVA is handled after prior consultation. | Usable power capacity is 80% of the rating or less. (hotnet.co.jp/datacenter/ + brochure SDC20250820)
- Cooling
- Air cooling, Free cooling
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- Renewable power
- 100% renewable power
- Services
- Colocation and connectivity
- Certifications 1
- ISO 27001
Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.