HBA System Building Data Center
HBA Corporation · Sapporo · Regional Japan · Japan
- Design resilience tier
- III
- Redundancy (as published)
- Uninterruptible power supplies and dual-circuit incoming power equipment enable a stable power supply even during momentary outages or an outage on one circuit. For prolonged outages, power is secured by in-house generation equipment. (HBA-iDC brochure, as of April 2024) | incoming power method: dual supply (main and standby line, 1 each, via different substation routes) | emergency generators 500KVA×2 units, 400KVA×1 unit | uninterruptible power supply (UPS) 300KVA (redundant configuration)×2 units | air-conditioning method: air-cooled package air conditioners (8kw to 40kw) | earthquake countermeasures: seismically isolated building (HBA-iDC facility overview, accessed 26-09-2026)
- Floor area
- 570 m² whitespace
- Density (as published)
- Full rack specification: 42U, 100V-15A × 4; 1/2 rack specification: 20U, 100V-15A × 2; 1/4 rack specification: 10U, 100V-15A × 1; options: 100V power addition, installation of 1 circuit (100V-15A); 200V power addition (HBA-iDC brochure, as of April 2024)
- Cooling
- Air cooling, Free cooling
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- Services
- Colocation, connectivity and cloud and managed services
- Certifications 2
- ISO 27001ISO 20000-1
Interested in this location? Send one inquiry with your requirements and receive a response within one business day.