Kao Data Campus

Harlow Operations Limited · Harlow · London Metro · United Kingdom

Design resilience tier
III
Redundancy (as published)
'Tier 3 equivalent, concurrently maintainable colocation' (kaodata.com/services/colocation/, 05-09-2026). 'Highest calibre, concurrently maintainable Technology Suites providing 100% uptime guaranteed.' (kaodata.com/locations/harlow/). 'ISO certified Technology Suites providing concurrently maintainable colocation and 100% uptime.'
Max. rack density
1–20 kW/rack
Density (as published)
'Varying power densities, from 1-20 kW' (Individual Racks, kaodata.com/services/colocation/, 05-09-2026). 'Our Technology Suites are designed to support enterprise loads of 1100kW or 2200kW. Each format is deployed across either 4,500 or 9,000 sq ft of OCP-Ready, column free, technical space.'
Power band
5-20MW
Cooling
Air cooling, Free cooling
Availability
Availability on request
Cross-connect
On request
Renewable power
100% renewable power
Design PUE
Design PUE 1.2–1.4

Data trust

Power
Platform reviewed · 05 Sept 2026 · Recent
Rack density
Platform reviewed · 05 Sept 2026 · Recent
Availability
Imported · Recorded 08 Jun 2026 · Not recent
Claim this listing
ColocationConnectivityHigh-density / AIWholesaleISO 27001Cyber EssentialsISO 9001ISO 14001ISO 50001ISO 45001ISO 22301SOC 2ISAE 3000PCI DSSBREEAMOCP-ReadyDGX-ReadyBREEAM Excellent

Need a quote or an introduction? One request, with a response within two business days.

Request a quote

Do you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.