Green Mountain OSL1-Enebakk
Green Mountain Data Center · Ytre Enebakk · Oslo Metro · Norway
- Design resilience tier
- III
- Redundancy (as published)
- 2 independent grid supplies each fed from multiple hydropower plants; Automatic standby generators; N+1 chiller solution designed for precision
- Security
- 24/7 on-site security
- Year built
- 2020
- Power band
- ≥50 MW
Platform reviewed · 23 Aug 2026 · Recent
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- Renewable power
- 100% renewable power
- Design PUE
- Design PUE 1.2 to 1.4
- Services
- Colocation and connectivity
- Certifications 5
- ISO 27001ISO 9001ISO 14001ISO 50001ISO 45001
Location
View on the full map · Elevation 186 m above sea level

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.