TEL-Rjukan

Green Mountain AS · Rjukan · Regional Norway · Norway

Design resilience tier
III
Redundancy (as published)
2 independent grid supplies each fed from multiple hydropower plants; Automatic standby generators; N+1 chiller solution designed for precision
Floor area
29,000 m²
Security
24/7 on-site security
Year built
2014
Power band
20–50 MW

Platform reviewed · 23 Aug 2026 · Recent

Cooling
Free cooling
Availability
Availability on request

Imported · Recorded 08 Jun 2026 · Not recent

Cross-connect
On request
Renewable power
100% renewable power
Design PUE
Design PUE < 1.2
Services
Colocation and connectivity
Certifications 4
ISO 9001ISO 14001Uptime TCDDUptime TCCF

Location

View on the full map · Elevation 253 m above sea level

Aerial view of TEL-Rjukan
Aerial view of the site. Imagery MapTiler, OpenStreetMap contributors.

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.