Discover datacenters / United Kingdom

Global Switch London East

Global Switch · London · London Metro · United Kingdom

Design resilience tier
III
Redundancy (as published)
London East Technical Specification (c) Global Switch 2023: 'Exceeds Tier III operational performance'; '132kV utility supply with N+N redundancy'; 'Technical (IT) power and mechanical systems supplied by on-site Diesel Rotary UPS with N+2 redundancy'; 'Fully diverse power distribution to technical areas'; '41.57MW of installed cooling provision - Minimum N+2 resilience on all systems'; 'All Global Switch data centres operate to a Tier III plus standard.'
Density (as published)
'Offering 2,000 W/m2 as standard, with higher power density solutions fully supported' (London East Technical Specification, (c) Global Switch 2023). 'Our London campus offers scalable space and flexible power provisioning, from light-load deployments to ultra-high-density AI and HPC environments' (globalswitch.com/data-centres/london/).
Power band
50MW+
Cooling
Air cooling
Availability
Availability on request
Cross-connect
On request

Data trust

Power
Imported · Recorded 08 Jun 2026 · Recent
Availability
Imported · Recorded 08 Jun 2026 · Not recent
Claim this listing
ColocationConnectivityHigh-density / AIWholesaleISO 9001ISO 14001ISO 27001ISO 45001ISO 50001PCI DSS

Need a quote or an introduction? One request, with a response within two business days.

Request a quote

Do you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.