Discover datacenters / Australia
Equinix ME2
Equinix, Inc. · Port Melbourne · Melbourne Metro · Australia
- Design resilience tier
- III
- Redundancy (as published)
- N+1 Power redundancy | UPS Redundancy N+1 | Generator Redundancy N+1 | Generator Autonomy 30 Hours or more (at full load) | N+2 Cooling redundancy | factsheet 09-2025: Utility Feeders Single Fed | UPS Configuration Parallel, 2 x 900 KVA | UPS Redundancy N+1 | Standby Power Configuration N+1 | Standby Power Redundancy Diesel Generators, Block Redundant | Cooling Configuration Adiabatic Air-cooled Chillers @N+1 CRAHs | Cooling Redundancy N+20%
- Floor area
- 8,172 m² whitespace
- Security
- 24/7 on-site security
- Year built
- 2020
- Rack density
- from 4 kW
- Density (as published)
- Minimum Cabinet Density | 4kVA | Power Distribution | 230v / 400v | factsheet 09-2025: Power and Cooling Density 3.6 kVA per cabinet
- Cooling
- Air cooling, Free cooling
- Renewable power
- Partly renewable power
- Services
- Colocation, connectivity and high-density
- Certifications 8
- ISO 14001ISO 22301ISO 27001ISO 50001ISO 9001LEEDPCI DSSSOC 2
Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.