Discover datacenters / United Arab Emirates

Equinix AD1 - Abu Dhabi

Equinix, Inc. · Masdar City · Abu Dhabi Metro · United Arab Emirates

Design resilience tier
III
Redundancy (as published)
N+1 Power redundancy | UPS Redundancy N+1 | N+20% Cooling redundancy | factsheet 03-2025: Utility Feeders 2 MV feeds | UPS Configuration Distributed redundant | UPS Redundancy N+1 | Standby Power Redundancy Distributed redundant | Cooling Configuration Water-cooled chillers, CRAH and cooling towers with emergency cooling tank | Cooling Redundancy N+20% | Tier III certified for design by Uptime Institute
Floor area
1,230 m² whitespace
Security
24/7 on-site security
Rack density
4–9 kW

Platform research · Recorded 24 Oct 2026 · Recent

Density (as published)
Minimum Cabinet Density 4kVA | Power Distribution 230v / 400v | factsheet 03-2025: Power and Cooling Density 3.0 - 10.0 kVA per cabinet
Cooling
Air cooling
Renewable power
100% renewable power
Services
Colocation and connectivity
Certifications 10
Cyber EssentialsEU Code of ConductISO 14001ISO 22301ISO 27001ISO 45001ISO 50001ISO 9001PCI DSSSOC 2

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.