Discover datacenters / Germany
Datacenter Hannover
envia TEL GmbH · Sehnde · Regional Germany · Germany
- Redundancy (as published)
- TÜV NORD CERT, certificate TSI.STANDARD V4.6 Level 3 (extended), security area Data Center Hannover, 26.03.2026: power supply: "Outages are absorbed by a redundant design. Standby and UPS power supply of the IT as well as the security systems is in place." Air-handling systems: "Compliance with the climate specifications is monitored remotely. Outages are absorbed by a redundant design." · Construction status October 2025 (location page): the infrastructure is largely complete and includes redundant power supply, battery buffers, diesel reserves and oxygen reduction for fire protection. · The UPS is running; the Oxy-Reduct system, the chillers and the standby power plant are in operation.
- Floor area
- 2,000 m² total building
- Year built
- 2026
- Rack density
- 6 kW
Platform reviewed · 24 Sept 2026 · Recent
- Availability
- Available
Platform reviewed · 04 Sept 2026 · Recent
- Cross-connect
- On request
- Renewable power
- 100% renewable power
- Services
- Colocation and connectivity
- Certifications 6
- ISO 27001ISO 9001ISO 50001EN 50600ISO 22237TÜViT TSI
Location
View on the full map · Elevation 62 m above sea level

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.