Discover datacenters / Germany
EMC Home of Data MUC I/II - MuCon-X
EMC Home of Data GmbH · Munich · Munich Metro · Germany
- Design resilience tier
- III
- Redundancy (as published)
- Factsheet campus MUC I/II: 'Redundant 10kV connections, transformers, and main distribution boards', 'Multiple redundant UPS systems (2N+1)', 'Per rack: 3–15kW dual-path power supply', 'Fully redundant air conditioning systems (2N)'. Locatiepagina Munich I: 'Multiple emergency power and UPS systems (N+1 or 2N+1)', 'Two-path energy distribution', 'Redundant cooling network to supply the server rooms and technical areas', 'Power supply systems in accordance with DIN EN 50600 in class VK3', 'Infrastructures certified according to DIN EN 50600 in availability class VK3 and efficiency class GN3', 'more than 99.9999% campus availability since 2008'
- Max. rack density
- 3–15 kW/rack
- Density (as published)
- Factsheet campus MUC I/II: 'Per rack: 3–15kW dual-path power supply'. Koelvermogen: 'Up to 2.5 kW cooling capacity per square meter'
- Cooling
- Air cooling, Indirect evaporative
- Availability
- Availability on request
- Cross-connect
- On request
- Renewable power
- 100% renewable power
- Design PUE
- Design PUE < 1.2
Data trust
- Rack density
- Platform reviewed · 03 Sept 2026 · Recent
- Availability
- Imported · Recorded 08 Jun 2026 · Not recent
ColocationConnectivityISO 27001ISO 9001ISO 50001EN 50600Climate Neutral Data Centre PactCSR 26001TÜV-Süd (green electricity)
Need a quote or an introduction? One request, with a response within two business days.
Request a quoteDo you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.