Discover datacenters / United States
Edged Atlanta ATL3
Edged Energy · Atlanta · Atlanta Metro · United States
- Site status
- Under construction
- Expected operational
- H1 2027
- Design resilience tier
- III
- Redundancy (as published)
- Reliability SLA 100% uptime, Tier III Design | UPS 1 MW Static UPS with 9.3 min backup; N+1 redundancy | Generators N+1 redundancy; 24 hr fuel supply | Configuration 4-to-make-3 | Cooling Reliability N+1 redundancy; Dual power source; 2N piping | Utility Power Redundant utility feeds
- Security
- 24/7 on-site security
- Rack density
- 70 kW · up to 200 kW liquid-cooled
Platform research · Recorded 19 Oct 2026 · Recent
- Density (as published)
- Supports AI-driven rack densities up to 70 kW/rack with air cooling and 200 kW/rack with plug and play liquid cooling integration. | designed to support ultra high-density workloads of 400+ kW per rack with liquid cooling and 120+ kW per rack with air cooling.
- Power band
- 20–50 MW
Platform research · Recorded 19 Oct 2026 · Recent
- Cooling
- Air cooling, Liquid-ready
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- PUE note
- Designed PUE Enables 1.15 PUE portfolio average
- Single-tenant facility
- Yes
- Services
- Single tenant, colocation, wholesale and high-density
Location
View on the full map · Elevation 266 m above sea level

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.