Discover datacenters / United Kingdom
Timico - Telford (TEL)
Digital Space Group Ltd · Telford · Birmingham Metro · United Kingdom
- Design resilience tier
- III
- Redundancy (as published)
- Power Redundancy: N+2 UPS configuration. Backup Power: N+1 diesel generators. Fuel Reserve: 48-hour onsite supply. Cooling Design: N+2 precision cooling. (locatiepagina, 03-09-2026) RESILIENCE N+2 UPS · N+3 generators. COOLING N+2 precision cooling. (Colocation data sheet, 05-2026)
- Max. rack density
- 10 kW/rack
- Density (as published)
- Rack Density: Up to 10kW per rack (higher density available)
- Power band
- 1-5MW
- Availability
- Available
- Cross-connect
- On request
- Renewable power
- 100% renewable power
- Design PUE
- Design PUE 1.4–1.6
Data trust
- Power
- Platform reviewed · 05 Sept 2026 · Recent
- Rack density
- Platform reviewed · 05 Sept 2026 · Recent
- Availability
- Platform reviewed · 05 Sept 2026 · Recent
ColocationConnectivityHigh-density / AIISO 27001ISO 27017Cyber EssentialsISO 9001ISO 14001ISO 20000-1PCI DSSCyber Essentials+
Need a quote or an introduction? One request, with a response within two business days.
Request a quoteDo you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.