- Design resilience tier
- III
- Redundancy (as published)
- Dual A+B power feeds; N+1 UPS systems; N+1 standby generators; N+1 chilled water; hot aisle containment; Tier 3 aligned infrastructure; fully redundant critical systems; diverse fibre entry routes
- Max. rack density
- 22 kW/rack
- Density (as published)
- Up to 22 kW per rack
- Power band
- 1-5MW
- Cooling
- Air cooling, Free cooling, Liquid-ready
- Availability
- Availability on request
- Cross-connect
- On request
- Renewable power
- 100% renewable power
- Design PUE
- Design PUE < 1.2
Data trust
- Power
- Imported · Recorded 08 Jun 2026 · Recent
- Rack density
- Platform reviewed · 05 Sept 2026 · Recent
- Availability
- Imported · Recorded 08 Jun 2026 · Not recent
ColocationConnectivityHigh-density / AICloud & MSPISO 27001ISO 9001PCI DSSCyber Essentials
Need a quote or an introduction? One request, with a response within two business days.
Request a quoteDo you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.