Discover datacenters / United Kingdom
Custodian CDC Maidstone 1
CustodianDC LTD. · Maidstone · Regional UK · United Kingdom
- Design resilience tier
- III
- Redundancy (as published)
- True 2N UPS Dual Path Resilience | 64 Amps (15KW) of fully redundant power per rack available | Triple network power grid feeds | Automatically activated diesel generators with priority refuelling contracts | Bi-weekly generator testing under full load | Dual feed or diverse dual feed | 2N resilient Evaporative Cooling System | A 100% Uptime Record (ME14 Technical Specification)
- Max. rack density
- 15 kW/rack
- Density (as published)
- 64 Amps (15KW) of fully redundant power per rack available (ME14 Technical Specification, Power)
- Power band
- 1-5MW
- Cooling
- Air cooling, Free cooling
- Availability
- Availability on request
- Cross-connect
- On request
- Renewable power
- 100% renewable power
- Design PUE
- Design PUE 1.2–1.4
Data trust
- Power
- Platform reviewed · 05 Sept 2026 · Recent
- Rack density
- Platform reviewed · 05 Sept 2026 · Recent
- Availability
- Imported · Recorded 08 Jun 2026 · Not recent
ColocationConnectivityISO 27001Climate Neutral Data Centre Pact
Need a quote or an introduction? One request, with a response within two business days.
Request a quoteDo you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.