Discover datacenters / United Kingdom

Custodian CDC Maidstone 1

CustodianDC LTD. · Maidstone · Regional UK · United Kingdom

Design resilience tier
III
Redundancy (as published)
True 2N UPS Dual Path Resilience | 64 Amps (15KW) of fully redundant power per rack available | Triple network power grid feeds | Automatically activated diesel generators with priority refuelling contracts | Bi-weekly generator testing under full load | Dual feed or diverse dual feed | 2N resilient Evaporative Cooling System | A 100% Uptime Record (ME14 Technical Specification)
Max. rack density
15 kW/rack
Density (as published)
64 Amps (15KW) of fully redundant power per rack available (ME14 Technical Specification, Power)
Power band
1-5MW
Cooling
Air cooling, Free cooling
Availability
Availability on request
Cross-connect
On request
Renewable power
100% renewable power
Design PUE
Design PUE 1.2–1.4

Data trust

Power
Platform reviewed · 05 Sept 2026 · Recent
Rack density
Platform reviewed · 05 Sept 2026 · Recent
Availability
Imported · Recorded 08 Jun 2026 · Not recent
Claim this listing
ColocationConnectivityISO 27001Climate Neutral Data Centre Pact

Need a quote or an introduction? One request, with a response within two business days.

Request a quote

Do you manage this datacenter? This profile is based on public sources. Claim this listing — free — and keep the data current yourself.