Discover datacenters / Japan

Colt Tokyo Inzai 1

Colt Data Centre Services · Inzai · Tokyo Metro · Japan

Design resilience tier
III
Redundancy (as published)
designed to a Colt tier 3 specification. Block redundant UPS (2N configuration as optional service) · N+1 configuration, gas turbine · Water-cooling system with N+1 configuration · N + 20% CRAH system · Over 72 hours of fuel on site at full load (Location Data Sheet 30-07-2024)
Floor area
4,000 m² whitespace
Rack density
20 kW

Platform reviewed · 25 Sept 2026 · Recent

Density (as published)
Minimum default density of 2.2kW critical load per m2 or 6kW per rack as standard · 6kW per rack as a standard and up to 20kW per rack with supplemental cooling (Location Data Sheet 30-07-2024)
Power band
5–20 MW

Imported · Recorded 08 Jun 2026 · Recent

Cooling
Air cooling
Availability
Availability on request

Imported · Recorded 08 Jun 2026 · Not recent

Cross-connect
On request
PUE note
Average annual PUE below 1.5.
Hyperscale facility
Yes
Services
Colocation and wholesale
Certifications 3
ISO 27001ISAE 3402PCI DSS

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.