Colt Tokyo Inzai 1
Colt Data Centre Services · Inzai · Tokyo Metro · Japan
- Design resilience tier
- III
- Redundancy (as published)
- designed to a Colt tier 3 specification. Block redundant UPS (2N configuration as optional service) · N+1 configuration, gas turbine · Water-cooling system with N+1 configuration · N + 20% CRAH system · Over 72 hours of fuel on site at full load (Location Data Sheet 30-07-2024)
- Floor area
- 4,000 m² whitespace
- Rack density
- 20 kW
Platform reviewed · 25 Sept 2026 · Recent
- Density (as published)
- Minimum default density of 2.2kW critical load per m2 or 6kW per rack as standard · 6kW per rack as a standard and up to 20kW per rack with supplemental cooling (Location Data Sheet 30-07-2024)
- Power band
- 5–20 MW
Imported · Recorded 08 Jun 2026 · Recent
- Cooling
- Air cooling
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- PUE note
- Average annual PUE below 1.5.
- Hyperscale facility
- Yes
- Services
- Colocation and wholesale
- Certifications 3
- ISO 27001ISAE 3402PCI DSS
Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.