- Redundancy (as published)
- N+1 via auxiliary units; Primary UPS configuration; Configurations: Primary UPS Configuration
- Floor area
- 465 m² total building
- Year built
- 1972
- Density (as published)
- 100 watts/SQFT, 1 substation, 1 utility entrance; Load Design: 100 watts/SQF
- Cooling
- Air cooling
- Availability
- Availability on request
Imported · Recorded 08 Jun 2026 · Not recent
- Cross-connect
- On request
- Renewable power
- Renewable, share not published
- Services
- Colocation, connectivity and hybrid cloud
- Certifications 1
- PCI DSS
Location
View on the full map · Elevation 72 m above sea level

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.
Data sources
This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.
Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.