Discover datacenters / Netherlands

Cellnex Media Gateway

Cellnex Netherlands · Hilversum · Amsterdam Metro · Netherlands

Design resilience tier
III
Floor area
1,400 m² total building
Year built
2001
Rack density
6 kW

Platform reviewed · 25 Sept 2026 · Recent

Power band
1–5 MW

Imported · Recorded 08 Jun 2026 · Recent

Availability
Available

Platform reviewed · 25 Sept 2026 · Recent

Cross-connect
On request
Renewable power
100% renewable power
Services
Colocation and connectivity

Location

View on the full map · Elevation 14 m above sea level

Aerial view of Cellnex Media Gateway
Aerial view of the site. Imagery MapTiler, OpenStreetMap contributors.

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.