Redundancy (as published)
Designed to Tier III standards; – 3 MW back-up generators – 2 MW UPS line-ups – N+1 block redundant topology – 500 KVA PDUs – 415V distribution to racks (A+B distribution); – Minimum N+1 redundancy – Closed-loop chilled water system design
Rack density
6 kW

Platform research · Recorded 20 Oct 2026 · Recent

Availability
Availability on request

Imported · Recorded 08 Jun 2026 · Not recent

Cross-connect
On request
Services
Colocation

Location

View on the full map · Elevation 60 m above sea level

Aerial view of Aligned PDX-01
Aerial view of the site. Imagery MapTiler, OpenStreetMap contributors.

Interested in this location? Send one inquiry with your requirements and receive a response within one business day.

Data sources

This profile is based on public sources; the operator has not yet confirmed its data. Confirmed data carries the Verified badge and a confirmation date.

Do you manage this datacenter? Claim your listing at no cost and keep the data current yourself.