China Mobile International · Mörfelden-Walldorf · Frankfurt Metro · Germany
- Design resilience tier
- III
- Redundancy (as published)
- Dual power supply from two different power substations; power system supported by 2N Transformers and UPS with a 12-minute backup battery; cooling system includes chilled water storage reserved for continuous cooling backup
- Power band
- 5-20MW
- Availability
- Availability on request
- Cross-connect
- On request